{"id":217,"date":"2011-03-02T18:29:00","date_gmt":"2011-03-02T18:29:00","guid":{"rendered":"http:\/\/www.collplacedemolition.co.uk\/?p=217"},"modified":"2011-03-02T18:29:00","modified_gmt":"2011-03-02T18:29:00","slug":"soft-stripping-works-complete","status":"publish","type":"post","link":"https:\/\/www.collplacedemolition.co.uk\/?p=217","title":{"rendered":"Soft Stripping Works Complete"},"content":{"rendered":"<p>All of the fixtures and fittings, including all asbestos containing materials have been safely removed from the building and transported from the site. We are now left with the concrete shell of the building.<\/p>\n<p><a href=\"http:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Stripped-Room.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-220\" title=\"Stripped Room\" src=\"http:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Stripped-Room-320x240.jpg\" alt=\"Stripped Room\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Stripped-Room-320x240.jpg 320w, https:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Stripped-Room.jpg 600w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/a><a href=\"http:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Floor-tile-removal.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-221\" title=\"Floor tile removal\" src=\"http:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Floor-tile-removal-320x240.jpg\" alt=\"Floor tile removal\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Floor-tile-removal-320x240.jpg 320w, https:\/\/www.collplacedemolition.co.uk\/wp-content\/uploads\/2011\/03\/Floor-tile-removal.jpg 600w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/a><\/p>\n<p>The next phase of works will involve drilling specific walls and columns within the concrete structure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All of the fixtures and fittings, including all asbestos containing materials have been safely removed from the building and transported from the site. We are now left with the concrete shell of the building. The next phase of works will &hellip; <a href=\"https:\/\/www.collplacedemolition.co.uk\/?p=217\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4,1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/217"}],"collection":[{"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=217"}],"version-history":[{"count":3,"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/217\/revisions"}],"predecessor-version":[{"id":223,"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=\/wp\/v2\/posts\/217\/revisions\/223"}],"wp:attachment":[{"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.collplacedemolition.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}